Friday, May 4, 2012

Failures are learning experiences

I hadn't been posting on what things we've tried and haven't worked out but a friend suggested that I post the attempts as well, because those can be just as interesting, and certainly educational.  So, here are a couple of our big fails.

Tapping the maple trees -
We tapped two of our neighbor's trees.  Yes, they are maples.  Yes, they were tapped right (slightly angled so that the syrup runs down into the bag).  Yes, we asked permission from the neighbors.  No, we didn't tap too close together or too many taps in one tree.  Despite all those good things, we didn't get any syrup.  That's because we were about 2 weeks late.  Last year in mid March was the time to start tapping.  This year, the syrup season was already over by mid March.  Because it was so warm so early, there wasn't much a syrup season for anyone, but you'll miss the entire season if you don't get out there.  I knew we should have gotten out earlier, but we let our daily life activities get in the way.  We still wanted syrup, so we bought some from a local maple farm when we attended Maple Fest at the end of March (their season was done by that time too, but the fest was planned well before anyone would know when the season would end).  My mom, who was able to tap her trees and get some, said that she and her friend usually get 20-25 quarts each when they are done.  This year, they only got 5 quarts.  We'll try again next year.

Jaimie and our neighbor Jess 


The bathroom project -
This is a BIG fail.  We were so good as demolition.  It's the putting back together part that is the hold up.  I realize that some of this is my fault.  I believed, with Jaimie's ambition, that we could have this finished over his spring break.  Alas, it is now his week of finals over a month later and we still have no shower.  We tore out the rotted wall.  We scraped off the ugly chipped teal plastic tiles.  We hired a plumber to make sure it could get the tub hooked up, and hired an electrician to run some wires and install the fan.  Then we were left with putting up walls, painting, and putting in the tiles, toilet, and sink.



I painted the walls.  The colors were fine, thanks to my MIL.  How it looked on the very roughly sanded and chipped walls did not look so great.  We changed our minds on what we wanted for the tiles (white subway tiles measuring 3 inches by 6 inches to 12 inch by 12 inch ceramic tiles).  With Jaimie's spring break over by this time so he's busy with school, I realize that this project is not going the way we planned.  I also realize that I have some generalizations and preconceived notions about my husband that are really not fair.

It was my belief that men, as a sex, are good with tools.  I also believed that men, just by their virtue of being male, knew about construction and what it entails.  I also had this generalization about men when it came to car repair, but I am learning that it may be better to hire a professional.  Now I'm certain that we'd be able to figure it out, but the task seemed insurmountable with the every day activities taking priority.  (You can't really take off a week of school or work any time you want, and it's difficult to find the extra time with two babes in the house).  So, being overwhelmed we requested some assistance.

It took some calling around and figuring things out, but we hired someone to install the tile.  Fortunately, he was someone we trusted to be in our home while we were out of the house.  Over the course of a week, he put up the walls around the tub, put up the waterproof membrane, and put up the tiles.  He also tiled the floor (hey, if we've got a tile guy, might as well make use of his services).  He left the remaining work to be done for us, but we still weren't quite prepared to deal with it.  The walls were not connected on the sides of the tub, the tiles were too thick and/or not cut to fit the shower hardware, and the grout had cracked around the base of the tub both on the floor and around the tub (meaning it wouldn't be waterproof after sealing it, meaning that we wouldn't be able to shower).

A few more weeks pass and we haven't dealt with the bathroom still.  Yes, we do have another toilet and sink, so that's helpful.  We were thinking of finishing it off ourselves but still seemed too busy, especially now that planting season came early.  We realized that, if we don't get someone to do it, it's just not going to get done.  Jaimie decided that he is not confident in finishing up the project so we will be having someone do it for us. 

I am getting used to washing my hair in a tub.  It's not the easiest with bum-length hair but it's also not convenient to shower elsewhere, and I only wash my hair about twice a week anyway.  The girls think that it's fun to bathe in the kitchen sink (I don't want them splashing and getting the grout wet so only Jaimie and I are allowed to bathe in the tub).  I am looking forward to eventually having a shower in my own home again.



So there you have it.  We made many more fails than just these two, but these are the more interesting ones.  Even with these fails, I still get to relax tonight in a nice warm bath.

Thursday, March 15, 2012

Moving along with the bathroom project

A lot has happened since my last shower.  The demolition is done.  The first thing we did was scrape off those awful tiles.


Then I opened up the wall to get at the plumbing.



I was going to try to pull the old tub out in one piece, but it proved easier to break it up with a 2.5 lb hammer.  My dad came over to help, and we broke (well, I broke) two hammer handles getting the tub smashed.

I ended up needing to take out a lot more wall than I had anticipated.  I don't have pix of the plumbing end, but the plumber had me take out most of that wall and reframe it, which I did today.


In the pic below you can see the new vent fan, which I had the electricians install when they ran the wiring for the new tub.  It's a soaking tub with a heater and recirculating pump, and required a separate 20 amp circuit for the heater and another for the pump.  I had the electrician install the fan, as well, because I wanted it wired right, and I'm no electrician.  Actually, I didn't want to run the wires.  I figured I'd destroy the walls or something.  Sometimes you really do need to call in a professional.


Here's Shelly ready to start sanding the walls before we decided we really needed a bigger sander.  I'll pick that up tomorrow.


Here's me making sure the plugs will reach the outlets and being very relieved the new tub fits the alcove.  It's a tight fit, but it fits.


Here I am fantasizing about tomorrow night when I really get to take a bath.  This tub fits me so much better than the old one.

Here's Shelly having the same fantasy.


The plumber is coming back tomorrow to finish the pluming and connect the tub.  The joint is going to be jumping, because we have windows being installed tomorrow morning, too.

Now I'm going to finish my drink and help Shelly fold laundry.  See you tomorrow.

Sunday, March 11, 2012

Ya gotta do what ya gotta do

Jaimie here.  Shelly has always hated our main bathroom, and to be quite honest, so have I.  As you can see below, it's tiny (can't do anything about that) and very dated.



The sink is cracked, though it doesn't leak, and there is no vent fan (there is a window, so it's technically up to code).  The absence of a vent fan wasn't an issue before we had the windows replaced with well-sealed low-e, yadda yadda yadda, modern windows.  Now that there's no breeze blowing through the bathroom, the paint on the ceiling has started to peel and we get mildew or mold spots on the ceiling.  On top of that, the ugly teal tiles you can see in the first pic are horrible plastic things, and the shower surround was completely chopped when a previous owner put on a shower door (nasty things - hate 'em).  Here's the result of the bad surround installation:

It's a huge spot of rot behind the surround.  That section of wall will have to be replaced with greenwall.  We decided that, since I'm on Spring Break this week, we would replace the tub and its enclosure.  (Note that I also have to write a bunch of lesson plans this week.)

We went shopping yesterday to order the tub we wanted, a deep soaking tub with a recirculating heater, and decided to do the floor and walls while we were at it.  Oh, and we also decided to replace that cracked sink.  Hundreds of dollars later, we had a plan and a vent fan.  The new tub and enclosure would be delivered on Sunday and I'd install it on Monday.  (That was before we found the rotten wall.)

We started removing tiles as soon as the girls were in bed.


As Shelly says, this part was a lot of fun!  We also pulled off the wallpaper and made a start at loosening the adhesive (yep, that's the order in which we did it).

They delivered the tub this morning (Sunday), and we discovered that I had not actually ordered the surround!  Shelly was a bit upset by this.  Sometime between the tub delivery and our leaving for Menard's, we decided to tile the tub enclosure instead of using a surround.  This meant more work, but it also meant we could do what we wanted with it.  We decided to do a simple brick pattern with 3x6 white "subway" tile.  In the end, Shelly decided she's glad I forgot to order the surround.

Below are pics of tonight's demolition progress.  I think it was another great date night.  Now I'm going to take a shower in the old tub and wash my leg where the cat just scratched me.  I'm sure Shelly will be posting later.  See ya!